Partnerships

Ongoing Cases

Projects we are developing and evaluating with customers, and the way of working DICIO applies to every project.

01 · OTHER CASES

In-progress projects

Electric vehiclesIn progress

Power modules for high-density EV traction inverters

At the request of a major Korean customer, we are co-developing power modules with CoreSiC™ MOSFET and CoreIGBT™ devices for traction inverters. Device characteristics, module layout and thermal path are being designed to the customer's inverter; it will become a success story once supply is confirmed.

AI data centersIn progress

CoreSiC™ MOSFETs · power modules for large AI data-center chillers

At the request of a major Korean customer, we are developing CoreSiC™ MOSFET devices and power modules for the compressor drive of a large chiller that cools AI data centers. Designs are matched to the high-speed compressor inverter's switching frequency and efficiency targets; it remains an ongoing project until supply is confirmed.

Energy storageIn progress

Power modules for immersion-cooled ESS power conversion

Together with a major Korean company, we are developing power modules optimized for an immersion-cooled ESS PCS. Materials suited to the thermal path and coolant, and the immersion-reliability evaluation protocol, are being designed together; it remains an ongoing project until supply is confirmed.

* Customer names are shown once the customer agrees to disclosure.

02 · HOW EVERY PROJECT WORKS

The same five steps in every project

  1. 01

    Analyze the duty

    Topology · DC-link · current · switching frequency · cooling · lifetime

  2. 02

    Design for the duty

    Chip characteristics, module and thermal path designed for the switching frequency, load profile and topology

  3. 03

    Measure 1:1

    Side by side with the existing module in the customer's converter, across the full operating range

  4. 04

    Qualify independently

    AQG 324 / JEDEC / IEC 60749 tests by an independent lab · datasheet · reliability report

  5. 05

    Supply long term

    From samples to volume on the production line — PCN / PDN, supply agreement

Tell us your operating conditions.

We will answer with data measured in that system.